The UK Government has set an ambitious target of reaching 24GW of nuclear capacity by 2050 in its bid to move towards a low carbon energy system and safeguard security of supply. Small Modular Reactors (SMRs) deployed at pace and at scale, form a core part of the strategy.
The commitment to develop SMRs is clear, and following a competitive call, the newly formed Great British Nuclear is currently assessing the best SMR technologies from across the globe to take forward.
Globally, there’s more than 70 commercial SMR designs in development ,with countries at varying levels in their advancement. But there are common challenges and, to overcome them, opportunities to unlock efficiencies and benefits as the industry unites to accelerate novel technology into commercial reality.
Needless to say, safety is a huge priority. Any SMR faces a complex licencing and approval process, which could take several years.
The other major obstacle though is an economic one. The build rate required in the UK for example is unprecedented and we’ve not seen a proposed nuclear deployment on this scale since the “Messmer Plan” in the 1970s. Additionally, whilst SMRs may be faster to build and require less capital to develop, their cost effectiveness is yet to be proved. Potential investors are playing it safe, waiting for assurances that orders will roll-in.
To justify investment, irrespective of the technology chosen, we’ll likely require a promise from government for a minimum order of SMR units – ideally based on a single standardised design that can be replicated, in order to achieve economies of scale. In other words, a fleet deployment approach.
An SMR Techno-Economic Assessment (TEA) conducted in 2016, for what was then the Department of Energy and Climate Change, honed in this recommendation. We advised that a fleet-based approach would be fundamental to securing finance for the required advanced manufacturing and assembly facilities and to delivering a ROI.
Fleet deployment, using a repeatable design, is also the most cost effective and time efficient way to deliver the new infrastructure at scale and bring it online quickly. It’s a process already working well in larger nuclear builds.
Hinkley Point C provides a good illustration of the benefits. Timings on the construction elements of the second site for example have been significantly reduced using learnings and data captured from design and build of the first. And now, the proposed Sizewell C power station is set to follow the same process, replicating Hinkley Point C’s design and supply chain learnings and expertise. In effect, Sizewell C will become units 3 and 4 of the UK EPR fleet . Through replication and innovation, its estimated £4bn will be cut from the build budget of Sizewell C. Around half of these savings will come from eradicating the process of design approval from UK regulators.
SMRs could offer even further opportunities for design replication through simplification and standardisation by design to maximise the economy of series, as opposed to the economy of scale.
A successful fleet deployment of an SMR programme in the UK could bring other benefits for the wider economy too. One being the expansion of the supply chain, leading to job creation and a much needed skills boost for the sector. There’s also the potential for the UK to become a manufacturer and exporter of SMR technology.
Digital core
Crucial to realising the commercial and efficiency benefits of replication and fleet deployment though is a robust digital strategy. By utilising data and information management for instance to capture lessons learned from preceding projects, it will support safe and efficient delivery of further units, improve scheduling and reduce costs. For example, it’s estimated cost savings of 4-10% could be achieved using Building Information Modelling (BIM) in SMR deployment, largely gained by increases in efficiency.
It is often hard for new projects to appreciate the value of digitalisation, particularly when, as in the case of SMRs, there’s not yet any tangible evidence, but it’s vital the new build nuclear industry embraces digital technology. It requires investment – both financial and resource - but as we’re seeing with other projects like Hinkley Point C and Sizewell C, the efficiencies gained can be significant.
Digital needs to be at the core of SMR design and deployment, implemented from the ground up, to ensure the most benefits can be realised across the assets lifecycle, from construction and operation through to decommissioning.
By collecting, managing and exploiting data at each of the stages of a plants life, shared through collaborative Common Data Environments (CDE), it will also drive efficiencies in asset management and allow for more predictive and proactive Operations and Maintenance processes. There are also inherent improvements in safety, and livestreaming and tools such as digital twins are now often being used to reduce the number of people on site (and the associated costs and carbon footprint).
Focusing on the M in SMR
The modular in SMR offers another commercial advantage. Around 80% of an SMR could be constructed offsite, which reduces the capital cost by up to 37.98% compared to a traditional site-built method. Using Modern Methods of Construction (MMC), systems and components of the SMR can be assembled in factories off-site and later transferred for installation, almost like hooking in a piece of Lego.
Working in this way will bring improvements in quality control and working conditions and negates the impact of inclement weather on progress. Subsequent construction management also becomes that bit easier, lowering risk and reducing costs, through shorter build schedules, productivity increases and parallel working.
Successfully implementing modularisation though will require an early emphasis on logistics during the design phase, a site design that focuses on ease of installation of the modules and stringent inspections to ensure the modules comply with the required design tolerances. Taking into account these factors will prevent costly delays in the field during SMR construction.
Powering up
SMRs are scheduled to come online in the UK in the early 2030s, with a recent global study predicting 25% of nuclear sourced electricity will come from SMRs in 2043 .
However, it will take the right support, competition and approach, for SMRs to gain the financial backing they need to be rolled-out at the required scale and speed. Commitment from the Government for a fleet of units will help invigorate investors, but we must also make use of the growing suite of digital and advanced construction tools to deliver and operate SMRs safely, quickly and cost-effectively.
This article was originally published in Power Engineering International in October 2023.
Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.
AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.
BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.
Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.
The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.
The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.