Eastern Road Coastal Scheme

on this page

A 1-in-100-year flood defense is needed to protect residents, visitors, properties, and the environment at Portsea Island.

The coastal scheme upgrades and replaces ageing and inadequate defenses and is designed to reduce the risk of flooding from the sea for the next 100 years, protecting over 4,000 homes and 500 businesses.

AtkinsRéalis was appointed in 2019 by Coastal Partners, acting on behalf of Portsmouth City Council, to provide commercial and cost management on the coastal flood defense scheme.

The six-year project forms phases 4a and 4b of the wider North Portsea coastal scheme. The Eastern Road and Kendall Wharf segment comprises the installation of a 2km sea defense wall, the construction of an embankment and the raising of the access road.

AtkinsRéalis’ specialist Southampton-based marine/coastal cost management team are working closely with Coastal Partners to manage project budgets, ensuring that all post-contract prices are efficiently scrutinized, monitored, and managed.

Although the project experienced covid-related delays that impacted costs, the project is progressing well. AtkinsRéalis used our expertise in coastal defense cost management to challenge costs, where appropriate and investigate compensation events as instructed to protect our client’s interests.

We oversaw the management of the contractor’s costs and were asked to assist in the review of all compensation events resulting in further financial benefit.

DISCLAIMER

Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.

AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.

BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.

Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.

The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.

The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.



AtkinsRéalis provides a highly professional and integral service to managing large construction projects under the NEC3 & NEC4 construction contracts and I would recommend their services.

Caroline Timlett

North Portsea Project Manager at Coastal Partners

The project not only provides the required flood protection, but also significantly enhances the locality, including landscaping with wildflowers and tree planting, creating areas of seating, a wider footpath and incorporation of sections of glazing in the sea wall to maintain views for the public and from existing sailing clubs, outdoor activity centers and a caravan park.

Environmental considerations have been a foremost consideration with reduced winter working to encourage over wintering birds and foreshore reinstatement to promote the marine environment.

New standards in coastal defense will be achieved via the pioneering textured finish on the concrete portion of the sea wall. This demonstrates the UK’s first large-scale application of a textured sea wall specifically designed for inter-tidal ecology, improving habitats for marine plants and animals.

The surface is created by using an Eco Formliner and was developed by Coastal Partners in partnership with the University of Glasgow and Bournemouth University. The project partners were delighted when the Eco Formliner won the Coastal Management Award at the Environment Agency’s 2022 Flood and Coast Awards. 

The Eastern Road project is due to be completed in 2024, with further ongoing landscape maintenance until 2026.

Our priority is ensuring that Coastal Partners and Portsmouth City Council achieve best value for this publicly-funded project. This is a notable example of our specialist cost management service for coastal protection schemes.

Graham Broome

Regional Director, AtkinsRéalis