East Harbour Transit Hub

on this page

East Harbour Transit Hub is poised to be the 2nd busiest station in Toronto after Union Station and will serve as an interchange between GO Transit regional train service, the future Ontario Line subway, and connections to the future Broadview Avenue roadway extension.
 
The new East Harbour Transit Hub will connect public transit riders to the Lakeshore East and Stouffville GO Train lines as well as the future Ontario Line subway. Once complete, East Harbour is expected to serve approximately 100,000 daily riders. the new transit hub is projected to relieve congestion at Union Station by an estimated 14% during peak travel times. 
 
“People depend on public transit to be fast, reliable and get them where they need to go. Riders will now enjoy a better public transit experience.” - Olivia Chow, Mayor of Toronto.
 

 

Our role

AtkinsRéalis is proud to be part of the East Harbour Transit Hub Alliance with Bird Construction, Hatch Ltd. and Metrolinx. AtkinsRéalis and Bird Construction, in joint venture, manage the construction and delivery of the project alongside Hatch as design lead and owner participants from Metrolinx.  
 
 “We have a world-class project team with global and local expertise to ensure project delivery in full collaboration with our partners and client, as well as a commitment to quality and schedule performance.” - Ian L. Edwards, President and Chief Executive Officer, AtkinsRéalis.
 

 

What to expect 

  • Six tracks at one station – four for GO Trains and two for Ontario Line 
  • Modern passenger concourses for GO Trains and Ontario Line 
  • Accessible passenger pick-up and drop-off area 
  • Three island platforms – two for GO Trains and one for the Ontario Line 
  • Stairs and elevators to the rail platforms for easy connections 
  • Bicycle parking 
  • Convenient single GO Train connection to the Lakeshore East and Stouffville lines 
  • Connections to the future Broadview Avenue roadway extension 

 

 
 

 

Keeping people moving

 
Transformative transit projects are never without complexity, and the East Harbour Transit Hub is no different.
 
One of the key accomplishments has been widening the Eastern Avenue Rail Bridge to accommodate two new tracks for future service without impacting live GO Transit and VIA Rail trains travelling on adjacent tracks. To achieve this, our Alliance has worked collaboratively to design and complete work in stages while employing state-of-the-art technology to keep our team and the travelling public safe.  
 
Thanks to careful planning and our excellent team, our Alliance has made great progress, and we can start to see the East Harbour Transit Hub take shape.  
 
"The Metrolinx team is proud to work with partners in government and industry to deliver more transit options, reduce commute times, and ease congestion. East Harbour station will be one of the most important nodes on the region's transit map. It will connect the Ontario Line to an expanded GO Transit network in a way that will completely re-shape how we move through Toronto and beyond”Michael Lindsay, President and CEO, Metrolinx.
 

 

Investing locally 

 
Making sure local businesses benefit from the work we do in their community is an important project objective. Our Alliance procurement team tracks the purchase of supplies and services sourced within the GTA and within the project’s “hyper-local” community, which includes businesses within a 10-kilometre radius from the project site. We also track how much business is sourced through small and medium-sized enterprises and those owned by equity deserving groups.  
 
This is tracked as part of a Local Employment and Procurement KPI, which measures the team’s success in providing employment opportunities to women and racialized peoples and the direct costs spent with local businesses, small and medium enterprises, social enterprises and those led by Equity Deserving Groups. 
 
 

 

Health and safety

We have a mission to create a new standard of safety on rail and transit projects across Toronto. While our approach to achieving this vision is multi-faceted, it begins with a culture of personal commitment to protect ourselves and each other by placing safety at the heart of all we do. This commitment not only extends to working safely but also includes a psychology-based approach encouraging everyone to speak up, recognize positive behaviours and embrace new ways of working for the protection of all. In combination with technology that helps solve some of the greatest challenges on busy construction sites, like human machine interface, and participation in safety forums designed to share best practices and lessons learned with other project teams, we are proud to support Metrolinx by enhancing health and safety measures. 

 

 

 
 
DISCLAIMER

Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.

AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.

BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.

Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.

The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.

The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.



100,000
approximate daily riders served
6 tracks
Four for GO and two for Ontario Line
30 %
women on the team
4,000,000 +
workforce person hours