The Los Angeles County Metropolitan Transportation Authority (LACMTA) is on a mission to ease congestion and expand access to rail, bus and active transit across Los Angeles as the city prepares to host the 2028 Summer Olympic Games.
In November 2016, Los Angeles County residents overwhelmingly approved Measure M, which will raise $120 billion over 40 years to decrease traffic congestion by expanding rail, rapid bus and transit systems across the county. In 2017, the City of Los Angeles announced the “Twenty-Eight by 28” initiative, which called for LACMTA to build 28 road, transit and bicycle projects in anticipation of the 2028 Games.
Since 2018, we have been providing systems engineering support services, including:
- Conceptual-to-final-engineering designs
- Design services during construction (DSDC)
- Feasibility studies
- Project estimates and constructability reviews
- Updates to Metro Rail Design Criteria and specifications
Our support has spanned every active major transit infrastructure project for the 2028 Games, including, but not limited to:
Crenshaw/LAX Light Rail Transit (LRT): We supported systems construction management for the 8.5-mile, $2.1 billion Crenshaw/LAX or “K” line. This includes providing the systems resident engineer, technical leads and inspectors along with subsystem experts. In addition, we chaired daily and weekly coordination meetings with various LACMTA departments, the contractor, the California Public Utilities Commission (CPUC) and other third parties. Our team also managed the interface between the lead contractor and the supplier of the onboard software for the light rail vehicles’ train control system and coordinated fire, life safety and security activities.
D Line Subway Extension: We are providing DSDC for this 9-mile, $9.5 billion project, which will add seven new stations and a reliable, high-speed connection between west Los Angeles and downtown. Serving as LACMTA’s owner’s representative rail systems team across all three phases of the project, our scope of work includes providing construction and operations support, coordinating reviews of design criteria deviations impacting facilities and system interfaces with internal and external stakeholders, and overseeing factory, field and integration testing. We also are supporting comment resolution meetings and meetings with LACMTA personnel and other third-party stakeholders. This includes chairing the All Teams Systems Coordination meeting between the contractor and subconsultants.
Division 20 Widening and Turnback Facility: Our team is providing on-site support for traction power substations, train controls and electrical systems to ensure the Division 20 rail yard is upgraded as specified and designed. To ensure operations are not negatively impacted, we are coordinating work on two separate contracts with the contractor and LACMTA stakeholders. In addition, we are managing the project’s design, supporting technical reviews as part of the change management process, reviewing shop and installation drawings, overseeing testing, performing inspections and creating reports.
Southeast Gateway Line and East San Fernando Valley LRT: We are providing preliminary engineering design for traction power electrification systems of these LRT lines that will connect southeast Los Angeles County to downtown Los Angeles and improve connections and access to crucial destinations in the San Fernando Valley. This includes developing 30% design drawings and performance specifications for the traction power system connected to the mainline, maintenance facility and rail yard. Our team also developed and coordinated traction power substation site plans with facilities, civil designers, right-of-way owners, CPUC and the Los Angeles Department of Water and Power.
Through our efforts, we are helping LACMTA enhance mobility options for those attending the 2028 Games, make public transportation more accessible and affordable for seniors, students and the disabled, and create a legacy of improved transportation for Los Angeles’ future.
Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.
AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.
BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.
Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.
The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.
The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.
-
Markets
Transportation
-
Location
Los Angeles, CA
-
Client
Los Angeles County Metropolitan Transportation Authority (LACMTA)
-
Completion date
Ongoing