Leisure centers are some of the most energy intensive assets in any local authority estate. City of Doncaster Council had an additional challenge with Askern Leisure Centre – it was a coal-fired 1960s building and was the last coal fired heated swimming pool in England, in need of comprehensive refurbishment and was struggling with viability.

Energy audits across the council’s leisure estate were undertaken in preparation for a cohesive decarbonization strategy at Askern Leisure Centre. A major programme of retrofit and refurbishment works followed. These centered on a whole building approach to move the aging facility towards net zero, addressing both the thermal efficiency of the building's fabric and its MEP installations.

AtkinsRéalis was appointed to provide multidisciplinary services during phase 1 and 2, the leisure center project’s refurbishment.

City of Doncaster Council had been successful with a PSDS bid, and the resulting Salix administered funding required the project to be undertaken in two phases to meet expenditure deadlines. Phase 1 was completed at pace, with upgrades to the building’s fabric envelope and M&E services undertaken by the design & build contractor.

Phase 2 involved the internal refurbishment, and here the council was keen to improve control around the design and implementation. Our team was appointed to provide design, contract administration, project management and cost management services.

Embarking on a project at its midway point can be challenging but we developed an excellent relationship with the retained contractor Equans and worked together to transition the project to phase 2.

We began with a rigorous review of the phase 1 work using our knowledge as contract administrator and retained the same team as it was essential to mitigate the risk of design clashes between the two phases. At the same time, we undertook careful monitoring of the project budget, considering the phase 1 expenditure.

We also created project risk and design risk registers to address and avoid further design clashes, ensuring the project could seamlessly flow in to phase 2.

Another early task was the creation of a RIBA Stage 3 design package for the design & build contractor to develop. This was reinforced by our building surveying team’s extensive knowledge of existing buildings and current design standards. At each design stage, opportunities to reduce carbon emissions were identified. We reviewed the contractor’s detailed designs to ensure they met carbon reduction requirements, and we then monitored the quality of installations on site.

Our team effectively guided City of Doncaster Council and Doncaster Culture & Leisure Trust through the design and construction process, ensuring that their requirements aligned with a cost-effective, compliant internal refurbishment that met community needs and was realistic within the building’s constraints, whilst meeting net zero and Sport England design criteria.

Our stringent ongoing cost management meant the facility was delivered within budget and can now be operated cost-effectively for years to come.

Improvements include upgraded building fabric to reduce heat loss and energy consumption; replacement of windows and doors; re-covered and better insulated flat roofs and cladding, and new air handling systems. MEP installations were comprehensively replaced, including replacement of the coal-fired boilers with electric air source heat pumps. Materials were selected to provide longevity and to reduce future maintenance requirements.

The decarbonization endeavor moves the facility towards net zero. Emissions were previously 343.1 tCO2 per annum and are now expected to be 44.3 tCO2. Operational costs are reduced, and this successful approach can now be replicated in the council’s leisure estate. The project is of national importance too, as its sustainable design and performance will inform Sport England Design Standards for both newly built and refurbished sports facilities.

The project’s success is a testament to teamwork, problem solving and resilience in response to the multiple challenges presented by an old, deteriorating building.

The biggest wins are the social value and health gains. One of Doncaster Council’s key objectives is to improve local service provision to support health, social and cultural wellbeing, in this area where incomes are lower, and unemployment and physical inactivity are higher than national averages. The center makes a critical contribution to a more active borough, reducing health inequalities and bringing lasting benefits.

This project has won in the Net Zero category at Constructing Excellence Yorkshire and Humber 2023 awards.

DISCLAIMER

Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.

AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.

BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.

Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.

The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.

The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.



44.3 tCO²
pa carbon emissions anticipated (previous baseline 343.1 tCO² pa)
87%
reduction in carbon emissions

Services provided

  • Consulting, advisory & environmental services, Design & engineering, Project & construction management
DISCLAIMER

Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.

AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.

BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.

Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.

The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.

The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.



It's not every day that a project team transforms the country’s last coal-fired leisure center into a revitalized community asset, integrated in a country park and aiming to use electricity generated from renewable sources. Askern Leisure Centre will positively impact community health and wellbeing for years to come, and support City of Doncaster Council’s journey towards net zero.

Lee Scott

Director

City of Doncaster Council testimonial

"This was a pivotal project from which we learned a great deal. Not only do we now have an appealing and lower carbon leisure center, but we also have a baseline for other decarbonization projects in the council’s estate. AtkinsRéalis was instrumental in crystallizing our design, ensuring it was achievable and correctly interpreted, helping us get the most from our budget, and keeping the internal refurbishment on track."