Flooding remains a key threat to communities across Wales. Managing the risk through carefully planned flood alleviation schemes is a critical challenge for local authorities.
Neath Port Talbot County Borough Council is a unitary authority situated on the South West Wales coast and is intersected by three main rivers: the Neath, the Tawe and the Afan. The council is currently undertaking the Rock Street Flood Alleviation Scheme in the village of Glynneath, which lies alongside the river Neath and several other watercourses. The area has long been prone to flooding.
The council is currently undertaking the Rock Street Flood Alleviation Scheme in the village of Glynneath, which lies alongside the river Neath and several other watercourses. The area has long been prone to flooding.
The council is currently undertaking the Rock Street Flood Alleviation Scheme in the village of Glynneath, which lies alongside the river Neath and several other watercourses. The area has long been prone to flooding.
AtkinsRéalis is providing design support and health and safety services on the project. During the seventeen-month commission, we are working to ensure that a safe working environment is created while minimizing risk to the site team and the public.
The Rock Street Flood Alleviation Scheme constructs a new flood relief culvert through Glynneath and a new intake bay at Lancaster Close to divert the watercourse directly into the river Neath during periods of intense rainfall.
Together with a new twin box culvert bridge across the Nant Y Gwyddyl at the ford crossing on Glynmelyn road, the alleviation measures will reduce the impacts associated with surface water flooding and fluvial flooding in Glynneath.
The project brings several civil engineering issues that create health and safety challenges. Notably, operatives are working at deep excavation levels in unconsolidated ground conditions among eluvial deposits. The river embankment creates a constrained site, where there are few options for situating excavators and waste removal vehicles.
AtkinsRéalis’ role is to support Neath Port Talbot County Borough Council with the creation of a pro-health and safety culture, and the fulfilment of all statutory health and safety requirements on the project.
AtkinsRéalis was able to draw on a longstanding experience of civil engineering-related health and safety solutions to undertake meticulous reviews of the contractor’s technical proposals and traffic management plans, to reduce risk.
Raising community awareness of the risks was essential, as was assessing the risk of closure and/or diversion of pedestrian and vehicular routes and car parking. Our team contributed to the planning of these measures and assessed their safety. We ensured that barriers and signage were sufficient to prevent people taking their usual route, and that careful programming of the works allowed for the safest solutions to be employed.
A successful zero harm strategy has prevailed on the project to date.
The partially completed scheme has already been successful in reducing the impact of flooding, during high rainfall in early 2023. Construction works were halted and a combination of existing measures and partially completed new measures were used to divert the water into the river, away from its historical course.
This incident required us to swiftly review the plans for safe working in response to the emergency measures.
When completed, the flood alleviation scheme will improve the local community’s resilience to flood risk, reducing the adverse consequences of flooding on human health, the environment, cultural heritage, and economic activity.
Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.
AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.
BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.
Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.
The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.
The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.
This is a challenging project from a health and safety perspective, with operatives working at five-meter depth, in extremely confined spaces. Risks include water pressure during excavation, and heavy plant loads. Our considerable experience of this sector, together with our local knowledge, makes for a safe and healthy project and community environment.
Martyn Clark
Associate Director, AtkinsRéalis
Rock Street FAS has been an interesting project to be involved in. It has brought forward many health and safety challenges, from working alongside the river Neath, excavating at depth (11m) through a raised embankment, to thrust bore tunneling beneath a busy carriageway and between properties. All tasks have needed meticulous planning to ensure the safety and wellbeing of engineers and operatives on site. This is the first construction project I have worked on with AtkinsRéalis and their support team has been crucial to the successful completion of the project.
Richard Colman
Client Project Manager for Rock FAS & Drainage Manager at Neath Port Talbot County Borough Council