Client
Manchester City Council
Sarah Seasman
Associate Director, Warrington, United Kingdom contact form
Manchester Town Hall is, a much loved Grade 1 listed landmark in the city, Built in 1877, it is one of the finest examples of Victorian Neo Gothic architecture in the UK. The largest building in Albert Square, its imposing façade speaks with the authority of a long and distinguished history.
Behind the scenes however, much is in need of repair and refurbishment. We are at the heart of this endeavour, an integral part of this £324m project working with a wider team to bring this important building and public square back to its former glory.
Back in 2015 we completed the original year-long asset condition and digital survey (BIM). The survey met NRM3 and SFG20 standards and provided a digital database of information. This data, combined with a stakeholder engagement exercise, enabled robust data collection including an operational strategy review and space utilisation studies. Using this wealth of information, we worked with the council to properly understand the extent of what was needed. In 2017 we were appointed as cost consultants and contract administrators across an eight-year programme.
The overlying objectives are to secure the long-term future of the town hall and Albert Square. These include restoring and celebrating this significant heritage asset, improving the buildings accessibility and making it a great place for people to work and visit. The project also aims to reduce the building’s carbon footprint and operational costs as well as delivering economic and social value for Manchester.
One of the more complex challenges awaiting the team was the fact that typical construction approaches were not appropriate due to the scale, complexity and the heritage significance of the project. A Management Contract approach was therefore chosen to minimize the down time for Manchester City Council’s flagship physical asset. This approach also facilitates the use of specialist heritage suppliers and smaller local suppliers, enhancing both quality and social value.
We have primarily worked to maximize value by spending on restoration of heritage rather than new construction – fixing what we already have. One of the key issues for the project team and especially AtkinsRéalis, under this challenging form of procurement, was improving cost certainty. Always crucially aware of this area, we have developed innovative new approaches to strengthening cost certainty in order to drive and monitor improved outturn forecasting. We worked closely with the client facilities management team so our life cycle cost engineers could capture past building performance. Thanks to this fuller picture, we are able to tailor our expertise to the specifics of this historic building. The building speaks and we listen, giving back to the people of Manchester.
Please note that you are now leaving the AtkinsRéalis website (legal name: AtkinsRéalis Group inc.) and entering a website maintained by a third party (the "External Website") and that you do so at your own risk.
AtkinsRéalis has no control over the External Website, any data or other content contained therein or any additional linked websites. The link to the External Website is provided for convenience purposes only. By clicking "Accept" you acknowledge and agree that AtkinsRéalis is not responsible, and does not accept or assume any responsibility or liability whatsoever for the data protection policy, the content, the data or the technical operation of the External Website and/or any linked websites and that AtkinsRéalis is not liable for the terms and conditions (or terms of use) of the External Website. Further, you acknowledge and agree that you assume all risks resulting from entering and/or using the External Website and/or any linked websites.
BY ENTERING THE EXTERNAL WEBSITE, YOU ALSO ACKNOWLEDGE AND AGREE THAT YOU COMPLETELY AND IRREVOCABLY WAIVE ANY AND ALL RIGHTS AND CLAIMS AGAINST ATKINSRÉALIS, AND RELEASE, DISCHARGE, INDEMNIFY AND HOLD HARMLESS ATKINSRÉALIS, ITS OFFICERS, EMPLOYEES, DIRECTORS AND AGENTS FROM ANY AND ALL LIABILITY INCLUDING BUT NOT LIMITED TO LIABILITY FOR LOSS, DAMAGES, EXPENSES AND COSTS ARISING OUT OF OR IN CONNECTION WITH ENTERING AND/OR USING THE EXTERNAL WEBSITE AND/OR ANY LINKED WEBSITES AND ANY DATA AND/OR CONTENT CONTAINED THEREIN.
Such waiver and release specifically includes, without limitation, any and all rights and claims pertaining to reliance on the data or content of the External Website, or claims pertaining to the processing of personal data, including but not limited to any rights under any applicable data protection statute. You also recognize by clicking “Accept” that the terms of this disclaimer are reasonable.
The information provided by Virtua Research cited herein is provided “as is” and “as available” without warranty of any kind. Use of any Virtua Research data is at a user’s own risk and Virtua Research disclaims any liability for use of the Virtua Research data. Although the information is obtained or compiled from reliable sources Virtua Research neither can nor does guarantee or make any representation or warranty, either express or implied, as to the accuracy, validity, sequence, timeliness, completeness or continued availability of any information or data, including third-party content, made available herein. In no event shall Virtua Research be liable for any decision made or action or inaction taken in reliance on any information or data, including third-party content. Virtua Research further explicitly disclaims, to the fullest extent permitted by applicable law, any warranty of any kind, whether express or implied, including warranties of merchantability, fitness for a particular purpose and non-infringement.
The consensus estimate provided by Virtua Research is based on estimates, forecasts and predictions made by third party financial analysts, as described above. It is not prepared based on information provided by AtkinsRéalis and can only be seen as a consensus view on AtkinsRéalis' possible future results from an outside perspective. AtkinsRéalis has not provided input on these forecasts, except by referring to past publicly disclosed information. AtkinsRéalis does not accept any responsibility for the quality or accuracy of any individual or average of forecasts or estimates. This web page contains forward-looking statements based on current assumptions and forecasts made by third parties. Various known and unknown risks, uncertainties and other factors could lead to material differences between AtkinsRéalis' actual future results, financial situation, development or performance, and the estimates given here.
The project is approximately 40% of the way through its construction phase, with a further 2.5 years until Completion. It is a challenging and complex project, undertaken under a form of contract that is not widely used in the UK. The team is incredibly dedicated to its task, and is constantly striving to achieve best value for its client.
Paul Candelent
Project Director